From: route@monster.com
Sent: Friday, April 29, 2016 3:26 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Fred Le Fevre 5408
Rutledge Ct, The
Colony, TX 75056 Cell:
972-786-6657 f.lefevre@sbcglobal.net SUMMARY
OF QUALIFICATIONS · MS Word, Excel, Power Point, Outlook, Access, Project ,
Excel for Project Managers, Construction Estimating w/ Excel · Six Sigma Project Management · Scoping Management · Certification in Applied Project Management / Boston
University Corporate Education Center-Tech Skills · Construction Project Management Distance Program / Auburn
University · OSP Engineering, Field Notes, Aerial, Buried and UG,
Permitting and ROW Use · Aerial Distribution Pole-Line Design, Make-Ready, Guying
& Anchoring, Loading · ETA Certification CFOI-OSP (#FOITX1005) Structured Cabling
and F/O Installation 2002-2006 · AT&T document access and record systems OPTI-NT and
BSTCAD, LFACS, FACS-120, OPEDS, Map-viewer, OSP CM · VERAX Reporting & Management Database Administration · Prepare Feasibility Studies and Costs for Last Mile OSP,
ISP, Dark Fiber and Small Cell Projects PROFESSIONAL
EXPERIENCE PEG
Bandwidth
01/2013 – Present Senior
Construction Engineer & Fiber Backhaul Site Coordinator OSP / ISP · Maintains Tracker / Schedules and Monitors All PEG Site
Walks / Project Close-Outs · Prepare and Submit Site Drawings for Transport and
Submissions and Approvals for NTPS · Installation of HH and/or conduit to H-Frame, Shelter, or
Outdoor Compound · Installation of Transport Cabinet and Appropriate
Equipment/ Hardware, Connection of DC Power · Fiber to Compound and Splicing Status and Installation of
MRV Switch and Testing · Obtain ROW, access, utility easement information from
customer · Obtain A&E drawings, Prepare site plan, Redline site
plan and Redline for NTP submission · Monitor status of NTPs and Monitor status of sites
released to transport · Schedule installation of HH, conduit, transport cabinet,
and equipment · Coordinate with fiber construction crews as to projected
date of fiber to compound · Ensure HH and/or conduit is in place prior to arrival of
fiber · Ensure transport cabinets are installed and powered prior
to arrival of MW crews · Schedule connection of DC power, Install of MRVs, Assist
with provisioning of MRVs · Inspect transport cabinet installations for quality
control · Monitor and report status of site installations to
Director of Operations on a daily basis · Monitor equipment orders, arrange delivery, storage and
transport for cabinets, HHs, Hardware) · Respond to outages or equipment failures Osmose
Communications Services (BB Com) for Goodman Networks
09/2012-1/2013 Century
Link / Sprint FTTT / FTTH OSP Field Engineer MN · Fiber to the Tower and Fiber To the Cell Site Last Mile
Fiber Optic OSP Design for 229 existing Sprint Sites · Site Assessment Design Survey for Sprint · Site Survey, OSP Site Requirements, BoM, Power
Requirements, Scope of Work, Compound Drawings · Shelter and Racking requirements, Rooftops and Building
Colocations · Aerial, Buried and Underground Design Make-Ready and
Fieldwork · ROW Research, Permitting and Utility Research RJE
Telecom01/2012 – 09/2012 Windstream
/ Verizon Wireless Fiber to the Tower Construction Arkansas and WV Project · Long-haul and Backhaul Fiber Construction Management
,Supervision and Inspection to 177 existing cell sites · Supervised and Reviewed all Aerial Distribution Design and
Make-Ready · Supervised and inspected general contractors and equipment
responsible for aerial, buried and underground construction · Supervised and inspected splicing and testing of
fiber optic cable installation · Verified all row and easement requirements in
advance of construction equipment · Verified all 3rd party utility agreements, specifications and regulations
along route · Project Management Audit Group Staff · Project Management Audit Group Responsible for
Finalization of Client Documentation and Contract Deliverables · Project Management Audit Group Responsible for Permit and
ROW Close-out Processes · Project Management Audit Group Responsible for Authorized
Service Provider(ASP) Invoice and Financial Reconciliation Nexlink
Global
Services
11/2011 – 01/2012 OSP Field
Construction Supervisor for RUS / Stimulus Customer Projects · Long-Haul Fiber Project Supervisor in Missouri for Federal
Stimulus / RUS Utility Client · Supervised general contractors and equipment responsible
for aerial, buried and underground construction · Supervised splicing and testing of fiber optic cable
installation · Verified all row and easement requirements in
advance of construction equipment · Verified all 3rd party utility agreements, specifications and regulations
along route · Supervised four (4) OSP inspectors in 36 mile fiber optic
construction on MO DOT ROW · Supervised all aspects of staking, aerial construction and
make-ready, guying, anchoring · Supervised all aspects of buried, sign and vault
placements, conduit and boring construction applications · Reviewed OSP prints prior to construction and as-built
documentation daily · Produced daily reports as required Dynamic
Technical Services, Corinth, TX5/2010 – 11/2011 FTTT /
FTTH Construction Project Manager for AT&T · On-Premise at AT&T in Oklahoma City for
FTTX Projects FTTH, (FTTN-VRAD), FTTCS / ETTCS and FTTP · Fiber, Manhole / Hand-Hole and Conduit Placing · Additions and / or Arrangements to Cross Connect Cabinet · Placement of Properly Sized VRAD (Video Ready Access
Deployment) Cabinet · Bonding and Grounding, Evergood Power Cabinet
Installation Requirements Logical
Link Inc., Bedford, TX
12/2009 - 4/2010 Wireless
Implementation & Installation Project Manager for Zayo Bandwidth · Contracted to DSE/ Cobalt Construction for Zayo Bandwidth
in Indiana for 200+ Existing Sites (with T-Mobile) · Third Party Contract Management for fiber access and dark
fiber leasing, permit and row acquisition · EF&I Implementation, OSP/ISP IM & CPM for ASP’s,
SOW, NTP, MOP’s, BoM, Site Walks, BTS installation · H-fixture construction, Nema & Hoffman Cabinet
installations , · Purcell Box and Chatsworth 19” Rack Installation ,
Security Cage and Decking Installation · Backboard Installation , Free Standing and Wall Mounted
Ladder Racking Installation · Power Up, Turn-Up, Alarm Install, Verify Cross Connects,
Maintenance Window Work · Wireline Fiber Design, Fiber Backhaul / Backbone
Fiber (Core) Infrastructure Logical
Link Inc., Bedford, TX
8/2008 - 12/2009 Wireless
Implementation Engineering Design Project Manager Goodman Networks · Goodman Networks Boston/Providence Market Comcast Project
(with T-Mobile) · Site Assessment Design Survey for Comcast equipment
roll-out in excess of 800 existing sites · Site Survey, OSP Site Requirements, BoM, Power
Requirements, Scope of Work, Compound Drawings · Axerra AXN10 & Ciena 311, Ethernet To The Cell
Site (ETTCS) Install Feasibility · DAS Hub Equipment and Shelter Design Feasibility
Indoor and Outside Proposed Locations · Siterra Management Software Dynamic
Technical Services, Denton, TX
11/2003 - 8/2008 Senior
Manager of OSP Services / Infrastructure Project Manager · MCI WorldCom, AT&T, Verizon Business, Cox, and Time
Warner Cable. · New Orleans to Houston to San Antonio Micro-Duct Fiber
Placement Project including downtown New Orleans, Houston and San Antonio
metro rings · The projects consisted of but were not limited to, fiber
optic backhaul OSP and civil construction, wireless site survey and analysis,
UMTS implementation, aerial, buried, UG, conduit, inspection,
make-ready, FTTN - VRAD's / FTTP - FTTH / FTTCS - ETTCS,
ISP/OSP building industry consulting, structured cabling solutions and
collocations. Permit and ROW Acquisition. · Managed network services and infrastructure implementation
Managed a Computer Assisted Design, Engineering and Construction staff of 25. TXU
(Texas Electric Utilities) / TXU Communications, Dallas, TX8/1995 - 10/2003 Transport
Construction Manager · Construction Project Management of internal assets and
customer premise aerial and UG facilities such as transport, carrier,
collocation, fiber, wireless, coaxial, copper and REA/RUS
implementation as well as facility maintenance. · Reviewed all aspects of Third Party Pole-Line Design,
Make-Ready, Permitting and ROW Use · Design and construction methodologies for fiber optic
ground wire (FOGW), broadband over power line (PDSL) and universal mobile
telephone systems (UMTS); this included design and construction of sixty-six
Independent School District fiber optic systems in the state of Texas. Fiber
Installation to and maintenance of largest privately owned mobile radio
network in Texas. · Member of acquisition team for integration of
Lufkin-Conroe Telephone Co and Fort Bend Telephone Co assets and facilities. Microwave
Communications Inc (MCI) / MCI International, Richardson, TX(dba Verizon
Business) 3/1986 - 7/1995 OSP
Facilities Construction Manager · Domestic and international joint construction management
of long-haul and metro fiber optic implementation projects including but not
limited to: Jacksonville, FL to Los Angeles, Houston to Chicago,
Seattle to San Diego, El Paso to Denver, St. Louis to Kansas City and Metro
Rings for Houston, San Antonio, Mobile, Raleigh-Durham, Memphis and Detroit · Construction Methodologies used; underground, buried,
aerial, building, microwave / wireless / pcs, optical ground wire, railroad
row placement and restoration & upgrade (maintenance) projects. · Fiber installations to one of the largest microwave
networks in the world. · Projects constructed and managed in thirty-eight (38)
states and several foreign countries including, Canada border crossings,
Mexico border crossings and 9500 km fiber route in Mexico, Guam 20 mile fiber
optic buried project, Belize 56 mile fiber optic system with British Telecom
ranging in value from $100K to $250 Million. · Was on PCN / PCS initial trial team and acquisition teams
for the integration of Western Union, Southern Net, Mutual Signal, and other
purchased assets. National Science Foundation Network Ring (NSFNET) at UM in
Ann Arbor and UT, Dallas, Austin, Arlington, Permian Basin and El Paso campus
locations. EDUCATION Auburn
University Extension , Construction Project Management Program8/2008 - 1/2010 · CPM, CBM, Excel for PM, Construction Estimating w/
Excel · Comp TIA Project+ , Comp TIA Network+ Boston
University Corp Education Centers (Operated by Tech-Skills, LLC, - Addison,
TX Campus)8/2008 - 1/2010 · Project Management Professional (CAPM / PMP) Diploma
Program College
of the Mainland / Institute of Robotics Galveston County Campus, Texas City,
TX9/2002 - 12/2002 · Diploma - Certification - 60 Hours, Fiber Optic and
Broadband Electronic Technology · (LAN / WAN), wireless #, data & voice, structured
cabling, GPS, splicing / installation / theory) CSU
System - Colleges of Engineering and Continuing Education eLearning10/1998 -
12/2003 · Cal State University @ Sacramento Diploma - Utility
Management Program · Certificate – MS Project 2000 · Cal State Poly University @ Pomona Diploma – MS Visio 2002 University
of Missouri, Columbia, UM Extension, College of Public Admin &
Governmental Affairs9/1983 - 10/1984 · Diploma - City and County Planning and Plan Administration PROFESSIONAL
AFFILIATIONS · Texas Society of Telephone Engineers Member since 1986 · BICSI Member (member #127374) since 1995 · Electronic Technicians Association (ETA) Member (Certified
Member #FOITX1005) since 2002 · Project Management Institute (PMI) Member (member #
1384142) since 2009 · American Management Association (AMA) Enrolled in
management certification process AWARDS
RECEIVED (MCI) Team 400
Monthly Award for Michigan Project04/1993 Team 400
Monthly Award for PCS Network Project0/1993 Team 400
Monthly Award for Mutual Signal Network Acquisition11/1993 Team 400
Monthly Award for FAA Redundancy Project0/1994 4th
Quarter 1993 Facility Engineering Teamwork Award12/1993 Subject
of Telephony OSP Magazine article for Innovative Construction Approach in San
Luis Obispo, CA07/1994 Team 400
Monthly Award for Mexico Construction Project04/1995
|
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|